commitment  




   





UK outline
  High Performance Environments


EigenForge has strategically selected a number of data centre locations throughout the UK in consideration of their location and the type of hosting which they offer.


Key consideration include the ability to provide:

  • Efficiency! Efficiency! Efficiency! : read more
  • the power densities that todays supercomputers demand (around 20kW per rack)
  • Sufficient cooling capability for these systems, either air-cooling or water-cooling. This also includes floor-space layout to ensure hot aisle-cold aisle arrangements
  • Access and Security
  • Uninterruptable Power Supplies (UPS). All 'head-nodes' including 'login-nodes' must be on a UPS. For most clients this is sufficient but some clients also need the compute nodes within the supercomputing system to be on UPS, e.g. for those clients in finance who need to ensure calculations are completed within very strict time limits in handing over from financial centres.
  • Environment monitoring and fire suppression

Also important is the guaranteed uptime for the data centre network, usually five 9's (99.999% availability per year). This often exceeds the guaranteed availability within many organisations including medium sized sites.

 
© Copyright EigenForge 2010 Legal